Waterproofing structures: shielding against moisture and corrosion

Waterproofing encompasses a range of protective measures designed to safeguard building structures from the damaging impacts of moisture, aggressive environments, and atmospheric elements. Anti-corrosion waterproofing is particularly crucial for:

✔ Hydraulic structures

✔ Above-ground metal components

✔ Foundations, roofs, and swimming pools

Key requirements for waterproofing materials:

  • Water resistance
  • Resistance to chemical and mechanical stress
  • UV stability (for exterior application)
Полимочевина распыление

Polyurea is an innovative waterproofing material

Advantages of polyurea coatings:

✅   Seamless monolithic coating

✅   High adhesion to concrete, metal, and wood

✅   Wide temperature tolerance (from -50° C to +120° C)

✅   Rapid application (curing within 15-20 seconds)

✅   Service life: up to 50 years

Applications:

  • Foundation and basement waterproofing
  • Roof and pipeline protection
  • Swimming pool and tank lining
  • Corrosion prevention for metal structures
  • Industrial flooring

Polyurea application technology

  1. Substrate preparation – cleaning of contaminants, removal of cement laitance.
  2. Defect repair – sealing cracks and cold joints.
  3. Spraying – applying seamless 1-3 mm coating.

Problem areas in foundation waterproofing:

  • Microcracks in concrete
  • Cold joints (weak points in monolithic pours)

Interblock joints (in precast foundations)

Why choose polyurea?

🔹 Up to 3 times longer-lasting than traditional bituminous solutions
🔹 Rapid installation
🔹 Savings on repairs and maintenance

Order professional waterproofing!

Special offer: 10% discount for orders over 100 m²!

Details we treat separately

Apart from cracks and joints in the concrete itself, leaks most often start at details:

  • junctions with walls, parapets and equipment;
  • pipe and cable entries through the waterproofing;
  • internal and external corners, floor drains and outlets.

We prepare and treat these spots separately before the main spraying, so the coating at the detail is no thinner than on the flat.

How we hand over the work

  • We check the coating thickness over the whole area.
  • We inspect the coating for misses, blisters and delamination.
  • For tanks and pools we can do a trial water fill before handover, by agreement.

Free trial area

We will apply polyurea to a trial area on your site free of charge — you can assess the coating before signing the contract.

Over 20 years of experience, our own crews, ISO 9001 and ISO 45001 certified. We work across Uzbekistan.

See also: PU foam spraying · Anti-corrosion protection · Polymer floors

Contact

    English
    Telegram
    DQS work geography across Uzbekistan